logo

4 Probe LCD Reversing Radar with Lunar Probe Design Real Time Distance Feedback and IP67 Waterproof for Vehicle Parking Safety

30 pontos
MOQ
Negociável
preço
4 Probe LCD Reversing Radar with Lunar Probe Design Real Time Distance Feedback and IP67 Waterproof for Vehicle Parking Safety
Características Galeria Descrição de produto Peça umas citações
Características
Especificações
Distância de detecção: 0,3-2M (3M)
Distância do alarme: 0,3-1,5M (2M)
Alcance da tolerância: < 1 cm
Frequência de trabalho: 40 KHz
Tensão operacional: -40~80
Potência máxima: 2.5W
Informação básica
Lugar de origem: China
Marca: KING CROWN
Certificação: RoHS
Condições de Pagamento e Envio
Detalhes da embalagem: Exportar pacote padrão
Tempo de entrega: 45 dias
Termos de pagamento: L/C,T/T
Habilidade da fonte: 1000 conjuntos/mês
Descrição de produto
Parking Sensor Systems with Real-Time Distance Feedback

4 Lunar Shape Probe LCD Reversing Radar with 0.3-1.5m Distance Buzzer Parking Sensor Car Safety Alarm, Auto Parking Assistant Parts

Key Features
  • Unique lunar curved probe design for seamless embedded installation on car bumper without drilling traces
  • Built-in LCD digital screen displays real-time obstacle distance from 0.3m to 1.5m for intuitive parking reference
  • Graded beep buzzer alarm changes frequency according to obstacle range to remind drivers of approaching barriers
  • IP67 waterproof sensor probes adapt to rainy, dusty and extreme outdoor driving environments
  • Wide DC12V voltage design fits most mainstream passenger cars, SUVs and compact commercial vehicles
  • Simple wired plug-and-play structure reduces modification difficulty for auto repair shops and end users
Technical Specifications
Category Specific
Product Type 4 Lunar Probe LCD Buzzer Reversing Parking Radar
Camera Resolution N/A
Night Vision N/A, distance detection works day and night automatically
Waterproof Rating IP67 for all four radar probes
Voltage DC 12V Standard Vehicle Power Supply
Screen Size Small digital LCD display for distance reading
Wired or Wireless Full wired connection with car reversing lamp power
Working Temperature -30℃ ~ +75℃
Vehicle Compatibility Most 12V Sedans, SUVs, Light Small Commercial Vehicles
Product Overview

4-probe lunar style LCD reversing radar is a classic aftermarket car parking safety accessory developed by VisionCarCamera, widely applied for daily passenger vehicle parking assistance. Equipped with four curved lunar parking sensors and a matching digital LCD display, the system detects obstacles ranging from 0.3m to 1.5m precisely, sending segmented beep alert via built-in buzzer meanwhile showing exact distance value on screen. All probes comply with IP67 waterproof standard to resist splashing water and road dust, ensuring stable detection in harsh weather. It effectively prevents bumper scratch during narrow-space parking and becomes cost-effective auto safety spare parts for global car owners.

Frequently Asked Questions
Q1: What vehicles can this 4 lunar probe reversing radar be installed on?

A1: It fits all DC12V passenger cars, SUVs and small light commercial vehicles, not applicable for 24V heavy trucks without voltage converter.

Q2: Do you accept OEM & ODM customization for this parking radar product?

A2: Yes, we support custom outer shell color, private brand logo printing and package design according to customer personalized OEM demands.

Q3: How long is the factory warranty of this LCD reversing buzzer radar?

A3: We provide 12-month global warranty against non-artificial damage for all finished radar sets after shipment.

Q4: What is your minimum order quantity for bulk wholesale purchase?

A4: 1 set for sample order; formal bulk wholesale MOQ is 100 sets with preferential factory wholesale unit price.

Q5: Can you provide installation guide and after-sales technical support?

A5: We attach paper English installation manual inside each package and offer online remote technical guidance for installation problems.

Produtos recomendados
Entre em contato conosco
Pessoa de Contato : Mr. Damon
Telefone : +8617722631931
Caracteres restantes(20/3000)